Best of Jokes Current Jokes RHF Home Search Sponsor RHF?
Fun Stuff & Jokes
Previous | Browse the Best of RHF: "General Jokes 90-92" | Next

A short dictionary of construction terminology

jrferro@gaak.lcs.mit.edu (Jon R Ferro)
(funny)

Found posted in the Physical Planning Office at the Indiana University of Pennsylvania. Author unknown.

Contractor - A gambler who never gets to shuffle, cut or deal.

Bid Opening - A poker game in which the losing hand wins.

Bid - A wild guess carried out to two decimal places.

Low Bidder - A contractor who is wondering what he left out.

Engineer's Estimate - The cost of construction in heaven.

Project Manager - The conductor of an orchestra in which every musician is in a different union.

Critical Path Method - A management technique for losing your shirt under perfect control.

OSHA - A protective coating made by half-baking a mixture of fine print, red tape, split hairs and baloney--usually applied at random with a shotgun.

Strike - An effort to increase egg production by strangling the chicken.

Delayed Payment - A tourniquet applied at the pockets.

Completion Date - The point at which liquidated damages begin.

Liquidated Damages - A penalty for failing to achieve the impossible.

Auditor - Person who goes in after the war is lost and bayonets the wounded.

Lawyer - Person who goes in after the auditors to strip the bodies.


Previous | Browse the Best of RHF: "General Jokes 90-92" | Next

Best of Jokes | Current Jokes | RHF Home | Search